Overview

Tariffs

Sections

Generation

Generation of energy requires a physical interconnection between the generator and the existing SCE Transmission/Distribution Grid. SCE will need to study your project and prepare an Interconnection Agreement between SCE and the generator. For projects at lower voltage levels (typically 66kV or less), the Wholesale Distribution Access Tariff will apply. Regardless, your first step is to submit a WDAT Application with technical data and a Distribution Service Application to SCE.

If your project is interconnecting at higher voltage (typically anything higher than 66kV), there is a similar, but distinct, process that is led by the California Independent System Operator who coordinates with SCE for projects in our region. Information for that process can be found in the CAISO’s Tariff.

To sell your generation, or net it against your existing usage (net metering), you’ll need to work with other groups at SCE or other agencies that wish to buy power. For net metering and related programs, click here. For power sales to SCE, click here for SCE Power Purchase Programs and the best Power Purchase Agreement for your project.

Cluster Application Window Schedule Applicable To Generator Interconnection Requests Processed Under The Cluster Study Process

In accordance with SCE's WDAT Generator Interconnection Procedures (GIP), Cluster Application Windows will be opening (and closing) within the following schedule:

Anticipated Queue Schedule
Cluster Opening Date Closing Date
Queue Cluster Window 5* First Cluster Application Window
Mon Oct 17, 2011 Tue November 15, 2011
Second Cluster Application Window
Thu Mar 01, 2012 Apr 02, 2012
Queue Cluster Window 6 First Cluster Application Window
Mon Oct 15, 2012 Thurs Nov 15, 2012
Second Cluster Application Window
Fri Mar 01, 2013 Mon Apr 01, 2013

* Corresponds to the 2012 Interconnection Study Cycle.

Interconnection Requests for processing under a Cluster Process must be submitted during a Cluster Application Window. There will be two Cluster Application Windows associated with each Interconnection Study Cycle. The first Cluster Application Window will open on October 15 and close on November 15 of the year prior to the year in which the Interconnection Studies are performed. The second Cluster Application Window will open on March 1 and close on March 31 of the year in which the Interconnection Studies are performed.

  • Wholesale Distribution Access Tariff
    • Under the WDAT, see Attachment I for Generation Interconnection at the Distribution level.

Interconnection Study Reports For SCE-WDAT Generator — Interconnection Requests Greater Than 20 MW (PDFs)

SCE is currently performing a review of the reports that were previously posted on this site. An updated posting will be available soon.

Transmission

If you intend to build transmission/distribution lines, please review the following rules/regulations/information.

Wholesale Load

If you interested in a project that will actually add consumption, also referred to as load, to our system, you’ll want to also refer to the Wholesale Distribution Access Tariff. Your first step will be to submit a WDAT Application with technical data and a Distribution Service Application to SCE.

  • Wholesale Distribution Access Tariff
    • Under the WDAT, see Sections 1-24 for Load Interconnection

Rule 21

Public WDAT Queue

SCE - WDAT Generator Interconnection Requests (Excel)

Contact Us

Should you have any questions regarding SCE's Open Access Information, please contact us via one of the following methods:

Email: interconnectionQA@sce.com
Phone: (626) 302-3688
Mailing Address:

Grid Interconnection & Contract Development
Southern California Edison
2244 Walnut Grove Ave
PO Box 945
Rosemead, CA 91770

Generator Interconnection Process Workshops


SCE WDAT Amendment dated March 1, 2011:


WDAT Generator Inteconnection Process Reform Stakeholder Process:


Stakeholder comments on Reform Principles and Stakeholder Meetings

WDAT Large Generator Interconnection Process Reform (completed):


Cluster Application Window Schedule Applicable to Generator Interconnection Requests Processed under the Cluster Study Process

In accordance with SCE's WDAT Generator Interconnection Procedures (GIP), Cluster Application Windows will be opening (and closing) within the following schedule:

Anticipated Queue Schedule
Cluster Opening Date Closing Date
Queue Cluster Window 1 Mon Aug 11, 2008 Fri Jul 31, 2009
Queue Cluster Window 2 Thu Oct 01, 2009 Sun Jan 31, 2010
Queue Cluster Window 3 Thu Apr 01, 2010 Sat Jul 31, 2010
Queue Cluster Window 4 Fri Oct 01, 2010 Thu March 31, 2011
Queue Cluster Window 5* First Cluster Application Window
Mon Oct 17, 2011 Tue November 15, 2011
Second Cluster Application Window
Thu Mar 01, 2012 Apr 02, 2012

* Corresponds to the 2012 Interconnection Study Cycle.

Interconnection Requests for processing under a Cluster Process must be submitted during a Cluster Application Window. There will be two Cluster Application Windows associated with each Interconnection Study Cycle. The first Cluster Application Window will open on October 15 and close on November 15 of the year prior to the year in which the Interconnection Studies are performed. The second Cluster Application Window will open on March 1 and close on March 31 of the year in which the Interconnection Studies are performed.

SCE - WDAT Generator Interconnection Requests (Excel)

  • Interconnection Queue


    Transmission Owner Tariff

    Sections
    1. Preamble
    2. Effective Date
    3. TO Definitions
    4. Eligibility
    5. Access Charges and Transmission Rates
    6. Ancillary Services - Applicability and Charges
    7. Billing and Payment
    8. Obligation to Interconnect or Construct Transmission Expansions & Facility Upgrade
    9. Expansion Process
    10. Interconnection Process
    11. Uncontrollable Forces and Indemnification
    12. Regulatory Filings
    13. Creditworthiness
    14. Disputes
    15. Recovery of Reliability Services Costs
    16. Miscellaneous
    Appendices
    1. Transmission Revenue Requirement
    2. Charges for Wholesale Transmission Services
    3. Transmission Rates for End-Use Service
    4. Rates for Certain Ancillary Service Bids
    5. Notices
    6. Reliablity Services Rate Schedule
    7. Interconnection Procedures in Effect Prior To July 1, 2005
    8. Construction Work in Progress Ratemaking Mechanism
    9. Formula Rate; Attachment to Appendix IX
    Supplemental Documents


    Wholesale Distribution Access Tariff

    Sections
    1. Preamble and Applicability
    2. Definitions
    3. Ancillary Services
    4. Not Used
    5. Billing and Payment
    6. Regulatory Filings
    7. Uncontrollable Force and Indemnification
    8. Creditworthiness
    9. Dispute Resolution Procedures
    10. Governing Law
    11. Not Used
    12. Nature of Distribution Service
    13. Service Availability
    14. Distribution Customer Responsibilities
    15. Procedures for Arranging Distribution Service
    16. Additional Study Procedures for Distribution Service Requests
    17. Procedures if the Distribution Provider is Unable to Complete New Distribution Facilities for Distribution Service
    18. Not Used
    19. Not Used
    20. Metering and Power Factor Correction at the Point of Receipt or the Point of Delivery
    21. Compensation for Distribution Service
    22. Standed Cost Recovery
    23. Not Used
    24. Standards of Conduct
    Attachments
    1. Form of Service Agreement for Wholesale Distribution Service
    2. Technical and Operational Implementation of the Tariff for Wholesale Distribution Load
    3. Technical and Operational Implementation of the Tariff for Generation Resources
    4. Methodology for Completing a System Impact Study
    5. Index of Wholesale Distribution Service Customers
    6. Standard Large Generator Interconnection Procedures (LGIP)
    7. Standard Small Generator Interconnection Procedures (SGIP)
    8. Clustering Large Generator Interconnection Procedures (CLGIP)
    9. Generator Interconnection Procedures (GIP)
      1. Appendix 1 to GIP: Wholesale Distribution Access Tariff Interconnection Request for a Generating Facility
      2. Appendix 2 to GIP: Procedures for Transitioning Interconnection Requests Submitted Prior to Effective Date of the Generator Interconnection Procedures
      3. Appendix 3 to GIP: Generator Interconnection Study Process Agreement
      4. Appendix 4 to GIP: Independent Study Process Study Agreement
      5. Appendix 5 to GIP: Genertator Interconnection Agreement (GIA) for a Generating Facility Interconnecting Under the Cluster Study Process
      6. Appendix 6 to GIP: Genertator Interconnection Agreement (GIA) for a Generating Facility Interconnecting Under the Independent Study Process
      7. Appendix 7 to GIP: Genertator Interconnection Agreement (GIA) for a Generating Facility Interconnecting Under the Fast Track Process
      8. Appendix 8 to GIP: Certification Codes and Standards
      9. Appendix 9 to GIP: Certification of Small Generator Equipment Packages
      10. Appendix 10 to GIP: Application, Procedures, and Terms and Conditions for Interconnecting a Certified Inverter-Based Small Generating Facility No Larger than 10 kW ("10 kW Inverter Process")

      Interconnection Handbook

      Interconnection Study Reports for SCE-WDAT Generator — Interconnection Requests Greater Than 20 MW (PDFs)

      SCE is currently performing a review of the reports that were previously posted on this site. An updated posting will be available soon.

    10. FOR OVER 100 YEARS...LIFE. POWERED BY EDISON.

      Copyright © 2012 Southern California Edison. All Rights Reserved